Showing posts with label California High-Speed Rail. Show all posts
Showing posts with label California High-Speed Rail. Show all posts

November 14, 2013

Board Approves Allensworth Bypass

At their November 7th meeting, the California High Speed Rail (CHSR) Authority adopted the staff recommendation for the Fresno to Bakersfield alignment, which includes the Allensworth bypass.  Unlike the BNSF (Burlington North Santa Fe) Alternative through Allensworth, the Allensworth Bypass does not impact Colonel Allensworth State Historic Park or the Allensworth Ecological Reserve. Both the park and reserve are Section 4(f) properties, which are protected by the Federal HighwayAdministration.

On October 10th the CHSR Authority issued a request for qualifications to companies interested in bidding on the 60-mile Fresno-Allensworth section of the rail line. This is the second section of the rail line and will run from the south end of Fresno to the Tulare-Kern county line just south of the community of Allensworth and Colonel Allensworth State Historic Park. 

Contractors have until December 6th to submit their qualifications, then only contractors that the CHSR Authority deems qualified are able to bid on the contact for the Fresno-Allensworth section.

August 23, 2012

Comment on the High-Speed Rail Draft EIR


The California High-Speed Rail Authority released the second draft of the EIR (Environmental Impact Report) for the Fresno-to-Bakersfield section of the high-speed rail project on July 20, 2012.  The EIR and an Executive Summary of the report are available on the rail authority’s website.  You may also request a CD-ROM of the draft EIR by calling (916) 679-2341.The draft’s public comment period closes on October 19, 2012.  You can submit your comments on the rail authority’s website, by email at Fresno_Bakersfield@hsr.ca.gov, or at one of three public hearings:

Monday, August 27, 2012, 3-8 p.m.
Beale Memorial Library
701 Truxtun Avenue
Bakersfield, CA 93301

Tuesday, August 28, 2012, 3-8 p.m.
Hanford Fraternal Hall
1015 N. 10th Avenue
Hanford, CA 93230

Wednesday, August 29, 2012, 3-8 p.m.
Fresno Convention Center, Exhibit Hall III
848 M Street
Fresno, CA 93721

Saturday, August 25th the Citizens for CaliforniaHigh-Speed Rail Accountability will host a free workshop to explain how the review process works.  The workshop is from 9 a.m. to 12:30 p.m., at First Baptist Church, 9125 13 1/2 Ave., Hanford, California 93230. T he workshop is limited to 400 people; make your reservation by emailing cchsraorg@gmail.com.


Stephen Hill, Sr.

October 25, 2011

CSPF Comments on High-Speed Rail Route

Traci Verardo-Torres, vice-president of Government Affairs for the California State Parks Foundation (CSPF), has generously given us permission to publish these excerpts from the CSPF’s comments on the Draft Environmental Impact Report/Statement (DEIR) for the Fresno-to-Bakersfield section of the California High-Speed Rail.

 
In her October 11, 2011 letter to Tom Umberg, chair of the California High-Speed Rail Authority board of directors, Verarado-Torres addressed the impact that the High-Speed Rail will have on Colonel Allensworth State Historic Park.

 
The California High-Speed Rail Authority has announced that it will not release a Final Environment Impact Report for the Fresno-to-Bakersfield section of the High-Speed Rail as planned in January but will issue a Revised DEIR in the spring of 2012. There will be another official comment period following the release of the revised DEIR.

 
Stephen Hill, Sr.

 

Given the cultural and historical importance of Allensworth and the legislative intent to protect the park, CSPF is concerned that the proposed Project will have long lasting, negative impacts to Allensworth. Specifically, the proposed Project will impact the historical character at Allensworth, create barriers to public access and negatively impact the visitors experience at the park. In addition to those concerns, we do not believe the DEIR adequately analyzed all proposed alternatives presented. Our concerns are outlined below.

Degradation of the historical character of Allensworth
Noise

The high speed train operation will result in noise impacts to Allensworth, but the DEIR does not present a clear and comprehensive analysis of the anticipated noise impacts to the park. Of the noise measurement sites, only two were selected just southeast of Allensworth. It is difficult to verify in the DEIR if the locations are sufficient to determine the extent of the noise that will be increased at the park. The noise analysis does not consider the wide use of activities by visitors at the park. Specifically, what impacts will occur to overnight visitors at the campgrounds? Or impacts to day-use visitors that walk through the historical district? What are impacts to the numerous special events that take place throughout the year? These questions are not examined in the DEIR. Further noise analysis and testing is required near visitor utilized areas to understand the impact to Allensworth.

Of the mitigation measures suggested in the DEIR, none sufficiently reduce the impact of noise to Allensworth to less than significant. Installing sound barriers is not proposed at Allensworth, which is inappropriate given the unique park characteristics. If sound barriers were constructed, a new modern feature would be introduced that will lead to degradation of the visual character at Allensworth and are therefore not an applicable mitigation measure.

 
Visual

Both alternatives studied in the DEIR create significant visual impacts.

The Burlington North Santa Fe Alignment Alternative (“BNSF alternative”) track would be located less than 100 feet from the park, introducing a new contemporary and disruptive feature at Allensworth. This is reinforced by the analysis in the DEIR itself, “24-foot-high OCS system components and wires, right-of-way fencing, and high speed rail trains would introduce distinctly modern industrial elements into the visual foreground that would alter the character of the site and lower visual quality” (DEIR, p. 3.16.61).

The Allensworth bypass alignment would position the park between two rail lines and DEIR concludes would be visible at the park. Unfortunately, the DEIR presents only one visual simulation from Allensworth. Additional simulations at other locations at the park, such as the campground or other historical structures, are required to fully analyze the visual impacts to the park.

Public Access
Park entrance

It is unclear whether the BNSF alternative will require the closure and moving of the entrance. The DEIR notes in the Transportation section, “Twenty three of 25 miles of track would be at grade within Tulare County, on the east side of BSNF Railway right-of-way. Elevated segments are at the Tule River and Alpaugh Railroad spur. Local roads would be maintained, avoided, or realigned except for closures of Angola Drive and Palmer Avenue” (DEIR, p. 3.2-50).

Does the closure of Palmer Avenue mean a new park entrance will be created? This is a significant issue that is not sufficient addressed in the DEIR. In the Appendix 2-B railroad crossing, line No 70, Palmer Road is listed as closing. Under line No 71 for Avenue 24, an above road crossing is proposed. This seems to suggest that access to the park will be provided from a southern access entrance. It is unclear why the potential closure of the current public access and creation of a new entrance to the park is only disclosed in a few areas in the DEIR and appears to be hidden. If the primary entrance to the park is moved, numerous questions emerge:
  • Will the new entrance impose any new visual or noise degradation to the park?
  • When will the permanent closure occur?
  • How will the road closure be implemented?
Changes of public access to Allensworth are critical to understand when evaluating the proposed Project. The DEIR is insufficient and unclear on these points.

Construction

Construction of the BNSF alternative will result in public access disturbances and impediments to Allensworth. As noted above, the park entrance is located at Palmer Avenue, which is part of the land that would be acquired as part of the alternative. If the BNSF alternative is selected, it is critical that public access to Allensworth remains accessible. Without the opportunity to review a draft or final plan for construction, CSPF emphasizes that every possible attempt should be made to minimize the overall impact during construction.

Amtrak

The DEIR concludes that when the project comes to fruition, the current Amtrak line that services Allensworth will be adjusted in response to the completion of the proposed Project. It is not clear from the DEIR if the proposed Project will result in the discontinuance of specific rail stops at Allensworth. Transportation planning should seek to maximize, not eliminate public transportation options to outdoor recreation and culturally significant opportunities, and CSPF urges the continuance of park-specific Amtrak service to Allensworth.

DEIR fails to adequately analyze all the proposed alignments

The DEIR presents three alternative alignments in consideration to Allensworth, but only two are analyzed in the environmental review documents. The utilization of the existing corridor with BNSF, and the Allensworth Bypass that would go east of the park are examined as potential alternative alignments of the proposed Project. Another option suggested, but not analyzed, is to relocate the BNSF railway adjacent to the eastern side of the Allensworth Bypass. There is a lack of a full discussion of this alternative. The DEIR reports this alignment has not been discussed with BNSF, but that does not preclude the need to analyze potential impacts from the proposed alternative if mentioned as a possible alternative alignment in the draft document.

September 20, 2011

Public Hearing on High-Speed Train Route



This week the California High-Speed Rail Authority is holding public hearings on the draft Environmental Impact Report/Statement for the Fresno to Bakersfield section of the California High-Speed Train System.

The first hearing took place today in Fresno. The Hanford hearing is Wednesday, September 21, 2011, from 3 to 8pm at the Civic Auditorium, 400 N. Douty Street, Hanford, CA 63230. The Bakersfield hearing is Thursday, September 22, 2011, from 3 to 8pm at the Beale Memorial Library Auditorium, 701 Truxtun Ave, Bakersfield, CA 93301.

You can read the summary of the California HST EIR/EIS to see which route alignments will impact Colonel Allensworth SHP.

The California High-speed Rail Authority will be accepting public and agency comments on the draft EIR/EIS until Wednesday, September 28, 2011. Send your written comments to:

California High-speed Rail Authority
Fresno to Bakersfield Draft EIR/EIS Comments
770 L Street, Suite 800
Sacramento, CA 95814

Send email comments to:

Fresno_bakersfield@hsr.ca.gov

With the subject line “Draft EIR/EIS Comment”



Stephen Hill, Sr.

August 17, 2011

Fresno to Bakersfield Draft Environmental Impact Report


The draft Environmental Impact Report/Statement (EIR/EIS) for the Fresno to Bakersfield section of the California High-Speed Train System has been released. The draft evaluates six High-Speed Train (HST) alignments. The BNSF Alternative is a single continuous route from Fresno to Bakersfield. The Allensworth Bypass is one of five bypasses being considered for this section of the HST. The Allensworth Bypass would diverge from the BNSF Alternative at Avenue 84 in Tulare County and swing west of Allensworth State Historic Park, rejoining the BNSF Alternative at Elmo Highway in Kern County.

“The BNSF Alternative would require the acquisition of property from Allensworth State Historic Park and the Allensworth Ecological Reserve. This alternative would also cause visual and noise impact on the park. The Allensworth Bypass Alternative would avoid these impacts and reduce the acreage of jurisdictional waters permanently affected by the project. However, the Allensworth Bypass Alternative would have a greater property tax revenue reduction, cause more agricultural business impacts, convert more acres of farmland to nonagricultural uses, and affect more acres of Williamson Act land than the BNSF Alternative.”
The California High-Speed Rail Authority is accepting public and agency comments on the Draft EIR/EIS until September 28, 2011. After reviewing the public comments the Rail Authority will issue a final project EIR/EIS that includes responses to the submitted comments and the preferred alternative route. According to the Next Steps Schedule (below) operation of the Fresno to Bakersfield section of the High-Speed Rail will begin in 2018.

  
Next Steps Schedule

The summary and highlights of the California HST EIR/EIS gives more details about which of the twenty-four alternative combinations will have a visual and noise impact, introduce a modern feature that is not consistent with the historic atmosphere or require the acquiescent of property from Allensworth State Historic Park.
Please attend one of the public workshops, public hearings or submit your comments to the California High-Speed Rail Authority; they could help determine how the California HST will affect Colonel Allensworth State Historic Park.


Send written comments to:
California High-Speed Rail Authority
Fresno to Bakersfield Draft EIR/EIS Comments
770 L Street, Suite 800
Sacramento, CA 95814

Send email comments to:
With subject line "Draft EIR/EIS Comment”

California High-Speed Rail Authority Website:
http://www.cahighspeedrail.ca.gov/contact.aspx?cat=Fresno_-_Bakersfield

Stephen Hill, Sr.

June 19, 2011

High-Speed Rail Information Meeting

This week the California High-Speed Rail Authority is hosting three public information meeting about the Fresno-Bakersfield section of the high-speed rail route. This is your chance to learn about how the high-speed rail will impact Colonel Allensworth State Historic Park. These are the last public meeting about the Fresno – Bakersfield section of the route scheduled for 2011.

If you live near Allensworth or Bakersfield please make time to attend one of these important meeting. The California High-Speed Rail could have a big impact on Colonel Allensworth State Historic Park, this is the time for us to let the Rail Authority know we care about the park.

Tuesday, June 21
Time: 6:00 to 8:00 pm
Where: Allensworth Elementary School
            3320 Young Road
            Allensworth, CA 93219

Wednesday, June 22
Time: 5:00 – 7:00 pm
Where: Fruitvale Jr. High
            2114 Calloway Drive
            Bakersfield, CA 93308

Thursday, June 23
Time: 5:00 to 7:00 pm
Where: Fresno (TBD)

Stephen Hill, Sr.

May 18, 2011

High-Speed Train Public Meeting

Fresno to Bakersfield section of the 800-mile California High-Speed Rail



This week the California High-Speed Rail Authority have been hosting public Information meetings to answer questions and get input on the next steps for the Fresno to Bakersfield section of the California High-Speed Train project.

The first segment of the High-Speed Rail will begin near Madera, north Fresno, and end in Shafter, about 1o miles north of Bakersfield. The initial segment will incorporate as many as 120 miles depending on which of the alternative alignments are selected.


• Through Corcoran OR Corcoran Bypass


West of Allensworth Park OR along BNSF east of Allensworth Park


• Through Wasco & Shafter OR Wasco & Shafter Bypass


The alignment adjacent to the BNSF will impact Allensworth State Historic Park; the alternative west of the BNSF will avoid Allensworth State Historic Park.

For those in the Bakersfield area you can attend the Thursday, May 19, 2011, meeting at the Marriott Hotel, 801 Truxtun Ave, Bakersfield. From 5 -7 pm.



Stephen Hill, Sr.



April 01, 2011

Assemblywoman Carter Introduces AB 1077

Allensworth Hotel


62nd District Assembly Member Wilmer Amina Carter has introduced Assembly Bill No. 1077. This bill would add section 5006.10 to the Public Resources Code and would read:

(a) A person shall not develop any of the area within two-and-one-half miles of the boundary of Colonel Allensworth State Historic Park in Tulare County in a manner that would be incompatible with the historic or recreational significance of the park.

(b) This section does not apply to a development in Tulare County that was approved by the county on or before March 1, 2011.

You can read the complete bill on the California Legislature website.

In a March 31, 2011 story in The Press-Enterprise reporter Jim Miller called the bill “far-flung”, he went on to criticize Assemblywoman Carter because the park is more than 200 miles from her district.

This is the third time that Assemblywoman Carter has introduced a bill to prohibit development next to Colonel Allensworth State Historic Park. She introduced the first bill in 2007 during the battle over the two dairies that were scheduled to be built next to the park. She withdrew the bill after the dairy project was canceled. Last year she introduced Assembly Bill 2356, and then withdrew it because it could have affected the construction the California High Speed Rail.

Assembly Bill No. 1077 first committee hearing is April 26, 2011.



Stephen Hill, Sr.

December 21, 2010

High-Speed Rail Comes to Allensworth

  
At their December 20, 2010 board meeting the California High-Speed Rail Authority voted to committee matching state funds to the additional $616 million Federal High-Speed Rail Support funds – which were redistributed after being returned by Wisconsin and Ohio. These additional funds bring the total available for construction of the first segment of the California High-Speed rail to $5.5 billion.
The initial segment will begin in the Central Valley and incorporate as many as 120 miles depending on which of the alternative alignments are selected.

  • Through Corcoran OR Corcoran Bypass
  • West of Allensworth Park OR along BNSF east of Allensworth Park
  • Through Wasco & Shafter OR Wasco & Shafter Bypass
The alignment adjacent to the BNSF will impact Allensworth State Historic Park , the alternative west of the BNSF will avoid Allensworth State Historic Park.

The first segment will begin near Madera, north of Fresno, and end in Shafter, about 10 miles north of Bakersfield. If the more expensive alignments are selected the track will only be about 90 miles and stop at Allensworth. Alignment selection will be made after all environmental studies have been completed.

 
Stephen Hill, Sr.

June 03, 2010

Allensworth Heavy Maintenance Facility a No Go


In our Winter 2010 newsletter we reported that the Tulare County Association of Governments (TCAG) submitted a proposal to the California High Speed Rail Authority to build a heavy maintenance facility in Allensworth for the High Speed Rail System.

In a June 3, 2010 news release the California High-Speed Rail Authority announced that Allensworth was one of four sites that should not be included in further studies for the heavy maintenance facility because of land size, distance from recommended alignments and/or environmental impacts.

The authority recommended four sites for continued study as potential location for the Heavy Maintenance Facility.
     • Fresno Works – Located in Fresno
     • Kings County – Located in Hanford
     • Kern Council of Governments – Located in Wasco
     • Kern Council of Governments – Located in Shafter

Stephen Hill, Sr.

May 31, 2010

Allensworth High-Speed Rail Bypass

During the June 3, 2010 California High-Speed Rail Authority monthly meeting the staff will describe the alignment alternatives on the Fresno – Bakersfield section of the high-speed rail route. The monthly meeting will be held in the Sacramento City Council Chambers, 915 I Street, at 9:00 am.

Part of the alignment alternative is the Allensworth bypass. The current route of the High-Speed Rail impacts Colonel Allensworth State Historic Park, the Allensworth Ecological Reserve and the Pixley National wildlife Refuge. Most of the Pixley National Wildlife Refuge and Allensworth Ecological Reserve are located east of the current route. A bypass to the west would avoid the State Park, the Ecological Reserve, and the Pixley National wildlife Refuge.

A map the Allensworth bypass can be seen on the California High-Speed Rail Authority website.

The Alternatives Analysis report will be posted by the morning of June 3rd.


Stephen Hill, Sr.